fads\

Saturday, 18 March 2023

Drilling With MWD Operations & Procedures
Pre-job Requirements

Pre-job Requirements An operating company wishing to use a Measurement While Drilling system must first decide:

- what the basic data requirements are;

- which systems currently available can meet these requirements;

- whether the limitations and specifications of the system under consideration are acceptable for this application (in terms of accuracy, data rate, temperature, etc.).
https://www.drillingmanual.com/mwd-running-operations/

No comments:

Post a Comment