Rig Move Operations In Oil & Gas Guide & Checklist
https://youtu.be/_B-GJfsjVYY
Land Rig Move Planning
New Location Preparation
- Rig T.P shall inspect the new rig location (Check also types of drilling rigs) before moving to confirm leveling Dimensions, compaction, caller, access roads conditions & mud sump was done in a suitable way.
- NTP Make out rig layout on the new location.
- Prepare the area for drill pipe boxes.
- Cut off the conductor pipe at a suitable level above the ground.
https://www.drillingmanual.com/oil-rig-move-operations-procedure-onshore-offshore/
Thursday 23 February 2023
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment