Saturday, 7 January 2023
Single Zone Completion
Flowing wells equipped with a single tubing string are usually completed with a packer. Single-zone completions may involve the downhole commingling of production from several intervals within that zone. Examples of single-zone completions are shown in Figure 1.
At the design stage, optimum tubing size for maximum long-term flow rate, future artificial lift needs, and future workover operations should be considered.
Figure 1 Single zone completion
Tubingless Casing Flow.
https://bit.ly/3Xax4q3
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment