RIG INSPECTION GUIDELINES | RIG FLOOR, TDS, DRAWWORKS ACCEPTANCE
Rig Floor, Top Drive System, Drawworks Acceptance Guidelines
Rig Acceptance For Rig Floor Hoisting/Auxiliary Equipment
Purpose of Test
Verify the functionality of the hoisting equipment and the auxiliary equipment on Rig Floor.
Guidelines for Accepting Rig Hoisting / Auxiliary Equipment
- Remove Drawworks motor covers and visual check its condition (corrosion,