fads\

Wednesday 11 January 2023

Lag Time In Drilling | Actual & Calculations
A definite time interval is always required for pumping the samples from a particular depth to the surface where they can be collected. This critical time interval, when determined, is called “Drilling lag time” and can be measured in terms of pump strokes and in terms of time. This lag applies to all downhole information, including formation cuttings and the fluids (gas, oil, and water) that they contain.

Why it Should Be Accurate?
https://bit.ly/3QAF0P6

No comments:

Post a Comment