SIMPLE TIPS TO CONSIDER FOR ANY RIG ACCEPTANCE
Rig Acceptance
Points to be checked before rig acceptance
1. Weld 30” riser (weld two x 3” valve on the bottom of the conductor casing to be used to take a return to the caller if required, check conductor for any junk inside before welding.
2. Install cellar jet and function test it (fill the cellar with water and drain it to the waste pit with cellar jetting).
3. Make sure all the clamps for all high-pressure lines are installed.
4.