fads\

Thursday, 29 December 2022

Drilling Junk In Wellbore Risks and Mitigation Measures
We mean by drilling junk any material, any tool or any piece of equipment may fall down from surface of from downhole Bottom Hole Assembly BHA and equipment. The junk may jams the Drill String and produce easily a good stuck.

This type of stuck pipe usually occurs:

- Due to poor housekeeping on the rig floor.
- The hole cover not being installed.
- Downhole equipment failure.

Preventative Action For Wellbore Junk In Drilling

- Using drill string wiper rubber ASAP.
- Cover the hole all times.
https://bit.ly/3hVwBJw

No comments:

Post a Comment