Wait And Weight Method For Killing Operations
What Is Wait & Weight Killing Method?
The Wait and Weight is sometimes referred to as the Engineer's Method or the One Circulation Method. It does, at least in theory, kill the well in one circulation.
Once the well is Shut In (hard shut-in well procedure - Soft shut-in procedure) and pressures stabilized, the Shut-In Drill Pipe pressure is used to calculate the kill mud weight. When ready, Kill mud is pumped down the Drill Pipe.
https://www.drillingmanual.com/the-wait-and-weight-method/
Tuesday, 22 November 2022
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment