fads\

Tuesday 8 November 2022

Casing running - installation patterns
Oilfield drilling
Casing Running

Take into your considerations:

- Good practice when unloading cement is to blow the first few sacks of cement through the lines in order to prevent moisture contaminated cement from collecting in the tanks. Off-loaded cement should be blown into empty, clean tanks.
- If possible, avoid storing cement for long periods. Alternate tank usage systematically and check them.
https://www.drillingmanual.com/casing-running-installation-patterns/

No comments:

Post a Comment