Pre-job Requirements
Pre-job Requirements An operating company wishing to use an Measurement While Drilling system must first decide:
- what the basic data requirements are;
- which systems currently available can meet these requirements;
- whether the limitations and specifications of the system under
https://www.drillingmanual.com/mwd-running-operations/
No comments:
Post a Comment