Casing running - installation patterns
Oilfield drilling
Casing Running
Take into your considerations:
- Good practice when unloading cement is to blow the first few sacks of cement through the lines in order to prevent moisture contaminated cement from collecting in the tanks. Off-loaded cement should be blown into empty, clean tanks.
- If possible, avoid storing cement for long periods. Alternate tank usage systematically and check them.
https://www.drillingmanual.com/casing-running-installation-patterns/
Friday, 11 March 2022
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment