30" CP Driving Procedure
Material Requirements
The following materials shall be available on the rig upon arrival on location:
- 30" conductor casing pipes as per the Drilling Programme (squnch joints, rapid lock connectors or welded preparation).
- Pile hammer.
- Equipment for handling joints.
- Welding machine, if using welded connections.
- 26" bits.
- 26" stabs as per the BHA program.
- 20" casing.
- 20" casing equipment (shoe, etc.).
- Plate for 5" DP (inner-string).