Drilling With MWD System Operations & Procedures
Pre-job Requirements
Pre-job Requirements An operating company wishing to use an Measurement While Drilling system must first decide:
- what the basic data requirements are;
- which systems currently available can meet these requirements;
- whether the limitations and specifications of the system under consideration are acceptable for this application (in terms of accuracy, data rate, temperature, etc.).
https://www.drillingmanual.com/?p=7066
Thursday 9 December 2021
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment