fads\

Monday 25 October 2021

Rig Move Operations In Oil & Gas Guide & Checklist
Land Rig Move Planning

New Location Preparation

- Rig T.P shall inspect the new rig location before move to confirm leveling Dimensions, compaction, caller, access roads conditions & mud sump was done in suitable way.
- NTP Make out rig lay out on new location.
- Prepare area for drill pipe boxes.
- Cut off conductor pipe at suitable level above the ground.
- Check camp location and make the foot print for caravans.
https://www.drillingmanual.com/?p=6590

No comments:

Post a Comment